...
首页> 外文期刊>The engineers journal >Fighting flooding Mallow defence scheme passes its first major test
【24h】

Fighting flooding Mallow defence scheme passes its first major test

机译:防洪锦葵防御计划通过了首次重大测试

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In the wake of the devastation caused by the recent nationwide flooding, there is a renewed public awareness of the significant impact it can have, both at a human level, in terms of distress and suffering, and in commercial terms, with several hundred million euros worth of damage caused nationally, in the November 2009 floods alone.The town of Mallow in north Cork has a long history of flooding from the River Blackwater, with the town bridge being destroyed by flooding as long ago as 1628. The lower end of the main street flooded to significant depths, twice in 2008 alone.
机译:在最近发生的全国性洪灾造成的破坏之后,公众重新意识到其可能对人类造成的苦难和苦难以及在商业上造成数亿欧元的巨大影响仅在2009年11月的洪灾中,就造成了全国性的损失。科克北部的马洛镇(Mallow)从黑水河(Blackwater)泛滥起来已有悠久的历史,早在1628年,这座桥就被洪水摧毁。主要街道的下端被淹没到很深的深度,仅2008年就被洪水淹没了两次。

著录项

  • 来源
    《The engineers journal》 |2010年第1期|42-44|共3页
  • 作者

    Ken Leahy;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号