首页> 外文期刊>The Engineer >NEW PLANT FOR BIG BLADES
【24h】

NEW PLANT FOR BIG BLADES

机译:大刀片的新工厂

获取原文
获取原文并翻译 | 示例
           

摘要

Due to open in 2023, the plant will be operated by GE subsidiary LM Wind Power and will employ up to 750 people directly and 1,500 jobs supported indirectly. The factory will manufacture 107m long blades for GE's Haliade-X, which is claimed to be the world's most powerful offshore wind turbine "This new plant will contribute to the development of an industrial cluster dedicated to offshore wind in the North East of England," said Jerome Pecresse, president and CEO of GE Renewable Energy. Dogger Bank will initially use 190 GE Haliade-X 13MW offshore wind turbines over two sites (ASB) for an installed capacity of 2.47GW. The last phase of the North Sea project, Dogger Bank C, will use GE Haliade 14MW turbines, taking the overall capacity to 3.6GW on completion in 2026 and making it the world's largest offshore wind farm.
机译:由于2023年的开放,该工厂将由GE子公司LM风力发行运营,直接雇用高达750人和1,500个职位间接支持。 工厂将为GE的Haliade-X制造107米长的刀片,被声称是世界上最强大的海上风力涡轮机“这家新工厂将有助于开发致力于英国东北北部的海上风的产业集群” GE可再生能源总裁兼首席执行官Jerome Pecrache表示。 Dogger Bank最初将在两个站点(ASB)上使用190 GE Haliade-x 13MW的近海风力涡轮机,安装容量为2.47gW。 北海项目的最后一阶段,狗队银行C,将采用GE Haliade 14MW涡轮机,在2026年完成,将整体容量达到3.6GW,并使其成为世界上最大的离岸风电场。

著录项

  • 来源
    《The Engineer》 |2021年第7926期|8-8|共1页
  • 作者

    ANDREW WADE;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号