...
首页> 外文期刊>The energy daily >New Breed Of Hydro Coming To Minnesota Dam
【24h】

New Breed Of Hydro Coming To Minnesota Dam

机译:明尼苏达水坝的水力发电新品种

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

The Federal Energy Regulatory Commission has approved the nation's first commercial "hydrokinetic" project at an existing hydropower facility-the installation of two underwater turbines to generate power by harnessing fast-flowing water in the tailrace of a dam on the Mississippi River in Minnesota.rnThe December 15 decision by FERC opens the door for a new breed of hydropower that is seen as preferable by environmentalists because it does not require the building of dams that can block the movement of migratory fish or disrupt river systems.
机译:联邦能源管理委员会已经批准了该国在现有水力发电设施上的第一个商业“水动力”项目-安装两台水下涡轮机,以利用明尼苏达州密西西比河大坝的尾水中流过的快速流动水来发电。 FERC于12月15日做出的决定为新型水力发电打开了大门,环保主义者认为这是可取的,因为它不需要建造能阻止fish游鱼类运动或破坏河流系统的水坝。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号