首页> 外文期刊>The ENDS report >HATFIELD BROMATE RULING CONTESTED
【24h】

HATFIELD BROMATE RULING CONTESTED

机译:哈菲德·布罗姆特裁决

获取原文
获取原文并翻译 | 示例
           

摘要

Two companies told to pay for groundwater remediation near Hatfield in Hertfordshire are contesting the ruling. The environment department (DEFRA) ordered Crest Nicholson and Redland Minerals to pay for the interim treatment of groundwater contaminated with bromate and bromide in July following a public inquiry (ENDS Report 415, pp 22-23). Thames Water and Veolia Water Three Valleys have been pumping and treating the water since 2005 to try to stop a 20-kilometre plume of the pollutants spreading further. It has already affected both firms' water supplies.
机译:两家被告知要为位于赫特福德郡哈特菲尔德附近的地下水修复项目付费的公司正在对该裁决提出异议。在公开询问之后,环境部(DEFRA)下令Crest Nicholson和Redland Minerals于7月支付过渡处理溴酸盐和溴化物污染的地下水的费用(ENDS报告415,第22-23页)。泰晤士河水和威立雅水务自2005年以来,三个山谷一直在抽水和处理水,以试图阻止20公里的羽状污染物进一步扩散。它已经影响了两家公司的供水。

著录项

  • 来源
    《The ENDS report》 |2009年第418期|28|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号