首页> 外文期刊>The architects' journal >And the survey says...
【24h】

And the survey says...

机译:调查显示...

获取原文
获取原文并翻译 | 示例
       

摘要

Something my uncle always drilled into me from an early age was: 'If you get it right first time, you'll get it right sooner.' Over time I have come to realise that getting it right in one area can also reap benefits across other areas that depend upon the integrity of the first. In a practical, construction sense there is no better example than the foundations to a structure; get them wrong and the whole building may suffer as a result. The foundation of any design (the part upon which all decisions are based) is the building and site survey. Indeed, in the spirit of the 'train hard, fight easy' approach to lowering barriers, I am a great advocate of the motto: 'Survey accurately, design with certainty.' But how can you be sure that your survey is accurate and, moreover, how do you want to receive the survey data so that you can make the best use of it? From experience on a recent project, I outline below some 'must-have' requirements for any survey tender document. Many may seem obvious, but often it is the obvious things that are overlooked in the search for complex answers to simple problems.
机译:我叔叔从小就一直钻研我的东西是:“如果第一次就做对,那你会早点对付的。”随着时间的流逝,我逐渐意识到,在一个领域中做到正确还可以在其他方面受益,这取决于第一个领域的完整性。从实用的角度来讲,没有比建筑基础更好的例子了。弄错了它们,整个建筑物可能因此而遭受损失。任何设计(所有决策所依据的部分)的基础是建筑物和现场调查。的确,本着“艰苦奋斗,轻松应对”的精神,我坚决拥护座右铭:“准确调查,确定设计”。但是,如何确定自己的调查准确无误,又如何确保接收调查数据以便充分利用呢?根据最近项目的经验,我在下面概述了任何调查招标文件的一些“必备”要求。许多问题看似显而易见,但在寻找简单问题的复杂答案时,往往会忽略那些显而易见的事情。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号