首页> 外文期刊>The architects' journal >Snohetta team pays out £6 million over Turner Contemporary
【24h】

Snohetta team pays out £6 million over Turner Contemporary

机译:Snohetta团队向Turner Contemporary支付600万英镑

获取原文
获取原文并翻译 | 示例
           

摘要

A Snohetta-led design team has agreed to cough up £6 million to Kent County Council (KCC) in an out-of-court settlement over its doomed Turner Contemporary arts centre in Margate (pictured). KCC blamed Snohetta for the ballooning budget on the project, up from £7,399,000, as stated on its 2001 competition-winning entry, to at least £25 million when the plug was pulled in February 2006. It issued legal proceedings in 2008 to recover £5.8 million in 'wasted' design costs.
机译:由Snohetta领导的设计团队已同意向肯特郡议会(KCC)支付600万英镑,以解决其在马盖特(Margate)注定要亡的特纳当代艺术中心(Turner Contemporary arts)的庭外和解(如图)。 KCC指责Snohetta对该项目的预算激增,从2001年获胜项目中指出的7,399,000英镑增加到2006年2月拔出插头时的至少2500万英镑。它在2008年发布了法律诉讼以追回英镑。 580万“浪费”的设计成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号