首页> 外文期刊>The architects' journal >Q&A WITH BRISTOL MAYOR GEORGE FERGUSON
【24h】

Q&A WITH BRISTOL MAYOR GEORGE FERGUSON

机译:与布里斯托尔市长乔治·弗格森的问答

获取原文
获取原文并翻译 | 示例
       

摘要

How will Bristol's built environment be improved by the end of your first term? By 2016 we will have made significant improvements in housing, which has fallen to an all-time low. We will also have started the changes to Temple Meads Station and the enterprise zone, including construction of the arena. My real target is 2020, if I am re-elected in 2016 - by which time I hope to have repaired the centre of the city and to have re-connected the station to the centre. This is all part of a greater spatial plan for the city that I'm preparing. My greatest physical emphasis is on greening the city as the legacy for European Green Capital 2015.
机译:在您的第一学期末,布里斯托尔的建筑环境将如何得到改善?到2016年,我们将在住房方面取得显着改善,使住房数量降至历史最低水平。我们还将开始对Temple Meads Station和企业区进行更改,包括建设竞技场。如果我要在2016年再次当选,我的真正目标是2020年-那时我希望修复市中心,并重新将车站与市中心连接起来。这都是我正在准备的城市更大的空间计划的一部分。我最大的体育重点是将城市绿化作为2015年欧洲绿色首都的遗产。

著录项

  • 来源
    《The architects' journal》 |2013年第7期|19-19|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:32:31

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号