首页> 外文期刊>The architects' journal >Patel Taylor designs Battersea affordable homes
【24h】

Patel Taylor designs Battersea affordable homes

机译:Patel Taylor设计巴特西经济适用房

获取原文
获取原文并翻译 | 示例
       

摘要

Patel Taylor has been appointed to deliver affordable housing as part of the fourth phase of the redevelopment of Battersea Power station, AJ understands. The Malaysian-backed Battersea Power Station Development Company (BPSDC) is pushing ahead with the designs just a month after securing planning permission for Frank Gehry and Norman Foster's third phase of the £8 billion scheme. The news comes as pressure mounts on the developer to speed up the delivery of affordable homes at the southwest London site. Campaigners were disappointed by the number of homes set to be delivered in the first phases of the scheme -just three of the first 2,400 flats are earmarked as affordable family homes - and had called the figures 'derisory'. The phasing was agreed in the 2010 planning application after council consultants agreed there would be a negative impact on the development if affordable housing was delivered in the early phases.
机译:据AJ了解,帕特尔·泰勒(Patel Taylor)被任命为提供巴特西电站重建第四阶段工程的一部分,提供经济适用房。在获得弗兰克·盖里(Frank Gehry)和诺曼·福斯特(Norman Foster)耗资80亿英镑的计划的第三阶段的规划许可后仅一个月,马来西亚支持的巴特西电站开发公司(BPSDC)就在推进设计。消息传出之际,开发商承受着越来越大的压力,要求他们加快在伦敦西南地点交付经济适用房的速度。计划的第一阶段将交付的住房数量使活动家感到失望-在最初的2,400套公寓中只有三套被指定为负担得起的家庭住房-并称这个数字“荒谬”。在理事会顾问同意如果在早期阶段交付经济适用房将对发展产生负面影响之后,在2010年规划申请中就同意了这一阶段。

著录项

  • 来源
    《The architects' journal》 |2014年第21期|8-8|共1页
  • 作者

    Colin Marrs;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:32:00

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号