Sourcing realistic cost information very early in the construction planning process is essential to properly support decisions on what structural frame materials to use. Changing these decisions later in the process leads to difficulties that could delay the construction programme, partly through their impact on the design of building elements like foundations, finishes and cladding. Wrong decisions up front can mean higher costs for the frame itself as well as other elements. Frame material and configuration choice are key decisions that are made early in the planning process, usually based on initial outline information and comparative budget costings, and the guide leads planners through the correct decision making process to arrive at a properly informed choice.
机译:在施工计划过程的早期就获取现实的成本信息对于正确支持有关使用哪种结构框架材料的决策至关重要。在此过程的后期更改这些决定会导致困难,这些困难可能会延迟施工计划,部分原因是这些因素会影响基础,饰面和覆层等建筑元素的设计。预先做出错误的决定可能意味着框架本身以及其他要素的成本更高。框架材料和配置选择是在规划过程的早期做出的关键决定,通常基于初始轮廓信息和比较预算成本,并且指南会引导规划人员通过正确的决定过程来做出正确的选择。

著录项

  • 来源
    《The architects' journal》 |2017年第2appa期|33-33|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号