首页> 外文期刊>The architects' journal >The case for circular public sector procurement
【24h】

The case for circular public sector procurement

机译:循环公共部门采购案件

获取原文
获取原文并翻译 | 示例
       

摘要

Visitors to Brighton will have seen Madeira Terrace. The 1890s structure, built by borough surveyor Philip Lockwood, is said to be the longest cast-iron structure in Britain, its seatront arches running 850m and boasting decorative flourishes such as images of classical deities. It fell into disrepairand has been closed to the public since 2012 but now there is hope that Madeira Terrace can not only be restored, but that the latest thinking on the circular economy can play a part in its rebirth. Council funding has been made available to appoint a design team for phase 1 of the regeneration and principles such as enabling zero waste on site are part of the brief, in line with Brighton & Hove City Council's pledge to become carbon neutral by 2030. Back in September 2018, Brighton & Hove became one of the first councils inthe country to declare a climate emergency and since then has been working with advisers including architect Duncan Baker-Brown on a construction and tourism-focused circular economy route map.
机译:Brighton的游客将看到马德拉岛露台。由自治市镇测量师菲利普洛伍德建造的1890年代结构是英国最长的铸铁结构,其海东拱门运行850米,拥有古典神灵的图像等装饰蓬勃发展。它自2012年以来已经向公众关闭了,现在希望马德拉露台不仅可以恢复,而且对循环经济的最新思想可以在重生中发挥作用。委员会的资金已经可供任命一个设计团队的再生和原则,例如在现场启用零废物的原则是简介的一部分,符合布莱顿和霍夫市议会的承诺2030年代成为碳中立的碳中性。回到2018年9月,布莱顿&Hove成为宣布气候紧急宣布气候紧急的第一个理事会之一,此后一直在与建筑师邓肯贝克布朗在建筑和旅游的循环经济路线地图上工作。

著录项

  • 来源
    《The architects' journal》 |2020年第3期|10-12|共3页
  • 作者

    Will Hurst;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 22:31:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号