首页> 外文期刊>The architects' journal >Zero carbon might require a huge retrofit programme, but Manchester rises to a challenge
【24h】

Zero carbon might require a huge retrofit programme, but Manchester rises to a challenge

机译:零碳可能需要庞大的改造计划,但曼彻斯特面临挑战

获取原文
获取原文并翻译 | 示例
           

摘要

I studied in Manchester for a time and whenever I go back, the city always wows me with its pace of change - and how it embraces change. New towers and homes and bars spring up like dandelions. There is palpable energy and focus. A walk out of Piccadilly station used to be a particularly bleak affair, with pedestrians hemmed in by whooshing traffic. You could see the heart of the city, just over the road, but you couldn't get into it easily. The Manchester Curve pedestrian footbridge opened up the vista and those first few urban impressions are so much more welcoming now.
机译:我在曼彻斯特学习了一段时间,每当我回去时,这座城市总是以其变化的步伐以及它如何拥抱变化而令我赞叹。新的塔楼,房屋和酒吧像蒲公英一样兴起。有明显的精力和重点。从皮卡迪利车站(Piccadilly station)出来走走曾经是一件特别惨淡的事情,行人被车流挡住。您可以在马路对面看到市中心,但是却不容易进入。曼彻斯特曲线人行天桥开辟了远景,而现在最初的一些城市印象更受欢迎。

著录项

  • 来源
    《The architects' journal》 |2019年第9期|1-1|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号