...
首页> 外文期刊>The APPEA Journal >ASSESSING RISK IN CO_2 STORAGE PROJECTS
【24h】

ASSESSING RISK IN CO_2 STORAGE PROJECTS

机译:评估CO_2存储项目中的风险

获取原文
获取原文并翻译 | 示例

摘要

A key challenge to researchers involved with geological storage of CO_2 has been to develop an appropriate methodology to assess and compare alternative CO_2 injection projects on the basis of risk. Technical aspects, such as the risk of leakage and the effectiveness of the intended reservoir, clearly need to be considered, but so do less tangible aspects such as the value and safety of geological storage of CO_2, and potential impacts on the community and environment. The RISQUE method has been applied and found to be an appropriate approach to deliver a transparent risk assessment process that can interface with the wider community and allow stakeholders to assess whether the CO_2 injection process is safe, measurable and verifiable and whether a selected alternative delivers cost-effective greenhouse benefits. In Australia, under the GEODISC program, the approach was applied to assess the risk posed by conceptual CO_2 injection projects in four selected areas: Dongara, Petrel, Gippsland and Carnarvon. The assessment derived outputs that address key project performance indicators that: 1. are useful to compare projects; 2. include technical, economic and community risk events; 3. assist communication of risk to stakeholders; 4. can be incorporated into risk management design of injection projects; and 5. help identify specific areas for future research. The approach is to use quantitative techniques to characterise risk in terms of both the likelihood of identified risk events occurring (such as CO_2 escape and inadequate injectivity into the storage site) and of their consequences (such as environmental damage and loss of life). The approach integrates current best practice risk assessment methods with best available information provided by an expert panel. The results clearly showed the relationships between containment and effectiveness for all of the four conceptual CO_2 injection projects and indicated their acceptability with respect to two KPIs. Benefit-cost analysis showed which projects would probably be viable considering base-case economics, greenhouse benefits, and also the case after risk is taken into account. A societal risk profile was derived to compare the public safety risk posed by the injection projects with commonly accepted engineering target guidelines used for dams. The levels of amenity risk posed to the community by the projects were assessed, and their acceptability with respect to the specific KPI was evaluated. The risk assessment method and structure that was used should be applied to other potential CO_2 injection sites to compare and rank their suitability, and to assist selection of the most appropriate site for any injection project. These sites can be reassessed at any time, as further information becomes available.
机译:参与CO_2地质封存的研究人员面临的主要挑战是,要开发一种适当的方法,以根据风险评估和比较替代的CO_2注入项目。显然需要考虑技术方面的问题,例如泄漏风险和预期储层的有效性,但是不那么实际的方面,例如CO_2地质封存的价值和安全性,以及对社区和环境的潜在影响。已应用RISQUE方法,发现该方法是提供透明的风险评估过程的适当方法,该过程可以与更广泛的社区进行交互,并允许利益相关者评估CO_2注入过程是否安全,可测量和可验证,以及选定的替代方法是否能够产生成本有效的温室效益。在澳大利亚,根据GEODISC计划,该方法被用于评估四个选定区域中的概念性CO_2注入项目带来的风险:Dongara,Petrel,Gippsland和Carnarvon。评估得出的输出涉及关键项目绩效指标:1.对比较项目很有用; 2.包括技术,经济和社区风险事件; 3.协助与利益相关者进行风险沟通; 4.可纳入注塑项目风险管理设计中; 5.帮助确定未来研究的特定领域。该方法是使用定量技术从已识别的风险事件发生的可能性(例如CO_2逸出和向存储地点注入不足)及其后果(例如环境破坏和生命损失)方面表征风险。该方法将当前的最佳实践风险评估方法与专家小组提供的最佳可用信息相结合。结果清楚地表明了所有四个概念性CO_2注入项目的围堵性与有效性之间的关系,并表明了它们对于两个KPI的可接受性。效益成本分析表明,考虑基本情况的经济性,温室效应以及考虑风险后的情况,哪些项目可能可行。得出了社会风险概况,将注水项目带来的公共安全风险与大坝使用的公认工程目标准则进行了比较。评估了项目对社区造成的舒适性风险水平,并评估了其对于特定KPI的可接受性。所使用的风险评估方法和结构应应用于其他潜在的CO_2注入地点,以比较其适用性并对其进行排名,并协助为任何注入项目选择最合适的地点。随着获得更多信息,可以随时重新评估这些站点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号