A new approach for material ordering and multi-mode resource constraint project scheduling problem in a multi-site context under interval-valued fuzzy uncertainty

机译:在间隔模糊不确定性下,多站点上下文中的材料排序和多模式资源约束项目调度问题的新方法

获取原文
获取原文并翻译 | 示例
           

摘要

Taking both material procurement and project scheduling problem simultaneously has been proved the most noteworthy areas in project management. The ordering amount is a key factor due to the fact that through keeping a full stock of required materials, the probability of material shortage and corresponding inefficiency decline but the costs of inventory holding increase significantly. Besides, the delay in individual activities and consequently in project completion increase if a small amount of needed material is purchased. The multi-site context as one of the new resource constraint project scheduling problem (RCPSP) extensions has been widely utilized in some applications in real-world cases, especially in construction projects. In this paper, a new mathematical model is proposed for the combination of ordering problems considering all-unit discount policy and multi-mode RCPSP (MRCPSP) in the multi-site context. The developed model aims to minimize the project total cost as well as the completion time of the project. In the novel proposed mathematical model, the transportation time is crucial and depends on the site that activities are assigned. With respect to the inherent uncertainties in project management, the duration of activities, transportation time between sites, and lead time are regarded as triangular interval-valued fuzzy numbers. In addition, a new hybrid multi-objective uncertainty approach is presented to handle interval-valued fuzzy mathematical model. The results obtained by solving the presented model employing an application example from MPSPLIB data set and a real case study about seawater intake systems are appraised considering key parameters to validate the proposed model and provide some managerial insights.
机译:同时掌握了物料采购和项目调度问题,已被证明是项目管理中最值得注意的地区。订购金额是关键因素,因为通过保持所需材料的全部库存,材料短缺和相应的低效率下降,但库存持有的成本显着增加。此外,如果购买少量所需的材料,则单个活动的延迟和项目完成增加。作为新资源约束项目调度问题(RCPSP)扩展之一的多站点上下文已广泛应用于现实世界案例中的一些应用,特别是在建筑项目中。在本文中,提出了一种新的数学模型,用于在多站点上下文中考虑全部单元折扣策略和多模式RCPSP(MRCPSP)的排序问题的组合。开发的模式旨在最大限度地减少项目总成本以及项目的完成时间。在新颖的提出的数学模型中,运输时间至关重要,取决于分配活动的站点。关于项目管理中固有的不确定性,活动期间的持续时间,站点之间的运输时间和提前期被视为三角区间值模糊数。此外,提出了一种新的混合多目标不确定性方法来处理间隔值模糊数学模型。通过求解采用MPSPLIB数据集的应用示例的所呈现的模型获得的结果是考虑验证提出的模型并提供一些管理洞察的关键参数来评估对海水进气系统的实际案例研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号