首页> 外文期刊>Sustainable Energy, IEEE Transactions on >Risk-Constrained Coordination of Cascaded Hydro Units With Variable Wind Power Generation
【24h】

Risk-Constrained Coordination of Cascaded Hydro Units With Variable Wind Power Generation

机译:风力发电级联水电机组的风险约束协调

获取原文
获取原文并翻译 | 示例
           

摘要

This paper presents a stochastic hourly coordination strategy for wind units and cascaded hydro generation as storage to firm up the hourly dispatch in a generating company (GENCO). The proposed strategy is based on the stochastic price-based unit commitment (Stochastic PBUC) formulation which includes wind energy imbalance charges. The forecast errors of electricity market price and wind speed are simulated with the Monte Carlo method via a scenario approach. The risk-aversion constraints are considered for limiting a GENCO's financial risks when considering uncertain wind power generation. The proposed optimization model is solved by mixed-integer linear programming (MIP) and illustrative examples examine the effectiveness of the proposed risk-based coordination model for optimizing a GENCO's payoff.
机译:本文提出了一种用于风力发电机组和级联水力发电的随机小时协调策略,以确保发电公司(GENCO)的每小时调度。提议的策略基于基于随机价格的单位承诺(Stochastic PBUC)公式,其中包括风能不平衡费用。电力市场价格和风速的预测误差是通过蒙特卡罗方法通过情景方法来模拟的。当考虑不确定的风力发电时,可以考虑使用风险规避约束来限制GENCO的财务风险。通过混合整数线性规划(MIP)解决了所提出的优化模型,并且示例性示例检验了所提出的基于风险的协调模型对GENCO收益进行优化的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号