...
首页> 外文期刊>Sun & Wind Energy >Valle 1 and 2 in operation
【24h】

Valle 1 and 2 in operation

机译:瓦尔1和2在运营

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In January, the two identical 50 MW parabolic trough power plants Valle 1 and Valle 2 in Cadiz, Spain, went into operation. This has been announced by Torresol Energy, a joint venture between Abu Dhabi's sustainable energy company Masdar and Sener, a Spanish engineering and construction firm. Together, the plants will produce 320 GWh of electricity annually. They are both equipped with thermal storage. According to Torresol Energy, this allows them to produce electrical power for up to 7.5 hours without any radiation from the sun.
机译:1月,位于西班牙加的斯的两个相同的50 MW抛物线槽式电厂Valle 1和Valle 2投入运行。这是阿布扎比可持续能源公司Masdar与西班牙工程和建筑公司Sener的合资企业Torresol Energy宣布的。这些工厂合计每年将产生320 GWh的电力。它们都装有蓄热器。根据Torresol Energy的说法,这使他们能够产生长达7.5小时的电力,而不会受到太阳的任何辐射。

著录项

  • 来源
    《Sun & Wind Energy》 |2012年第3期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号