首页> 外文期刊>SPE production & facilities >Optimization of SAGD Wellbore Completions: Short-Production-Tubing-String Sensitivities
【24h】

Optimization of SAGD Wellbore Completions: Short-Production-Tubing-String Sensitivities

机译:SAGD井筒完井的优化:短期生产管柱敏感性

获取原文
获取原文并翻译 | 示例
       

摘要

A simulation study was conducted to examine the effects of changing the landing position of the short production-tubing string relative to the heel of a steam-assisted gravity-drainage (SAGD) production well. A homogeneous discretized wellbore model with the riser section was used in this study. Generally, a reservoir is modeled independently of the wellbore. However, this study models the reservoir and wellbore simultaneously in order to understand their interactions. SAGD performance is affected by many interrelated parameters; however, this paper is focused only on the effects of changing the short production-tubing string relative to the heel of the well.rnThis paper outlines two independent case studies:rn1. The first study involves shortening the short production-tubing string relative to the heel of the well. It was found that as the short tubing string was pulled back from the heel of the well, the bitumen-production rate decreased, and the amount of steam produced through the short production-tubing string increased.rn2. The second case study outlines the impact of extending the short production-tubing string past the heel of the well on bitumen production and steam/oil ratio (SOR). From this case study, it was found that as the short production-tubing string was pushed past the heel of the well, the bitumen-production rate stayed the same, but the steam-injection rate decreased, which consequently decreased the SOR. It was also observed that a lower pressure differential between the injector and producer well was established when the short production-tubing string was extended.rnThe results for this study will assist SAGD producers in re-evaluating the position of the short production-tubing string and find the most economical position for this string. This paper creates the foundation for further simulation efforts to incorporate a discretized model with the build section coupled to the reservoir. This will allow production engineers to optimize bitumen production by simultaneously simulating the reservoir and wellbore strings together. However, it must be kept in mind that the sensitivity study outlined in this paper only includes different placements of the short production-tubing string while keeping all other parameters constant. More work should be done in order to evaluate the interrelated effects of changing the location of the short production-tubing string with other wellbore and reservoir parameters.
机译:进行了模拟研究,以检验相对于蒸汽辅助重力排水(SAGD)生产井的根部,改变短生产管柱的着陆位置的影响。在这项研究中使用了具有立管截面的均匀离散井眼模型。通常,储层的建模与井眼无关。但是,本研究同时对储层和井眼进行建模,以了解它们之间的相互作用。 SAGD性能受许多相互关联的参数的影响;但是,本文仅着重于相对于井底改变短生产管柱的影响。rn本文概述了两个独立的案例研究:rn1。第一项研究涉及缩短相对于井底的短生产管柱。人们发现,随着短管柱从井底抽出,沥青的产生速率降低,而通过短管柱产生的蒸汽量增加。第二个案例研究概述了将短的生产管柱延伸到井底之后对沥青产量和蒸汽/油比(SOR)的影响。从该案例研究中发现,随着短的生产管柱被推过井底,沥青的生产率保持不变,但注汽率却下降,从而降低了SOR。还可以观察到,延长短生产管柱时,在注入器和生产井之间建立了较低的压力差。rn这项研究的结果将有助于SAGD生产商重新评估短生产管柱的位置和找到该字符串最经济的位置。本文为进一步的模拟工作奠定了基础,该模型将离散化模型与构建部分耦合到储层相结合。这将使生产工程师可以通过同时模拟储层和井筒来优化沥青生产。但是,必须牢记,本文概述的敏感性研究仅包括短生产管柱的不同位置,而其他所有参数保持不变。为了评估改变短生产管柱的位置与其他井眼和储层参数之间的相互关系,应该做更多的工作。

著录项

  • 来源
    《SPE production & facilities》 |2010年第1期|50-58|共9页
  • 作者

    Marya Cokar; John Graham;

  • 作者单位

    University of Wyoming;

    University of Calgary;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:37:46

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号