Basis of Design for Coiled-Tubing Underbalanoed Through-Tubing Drilling in the Sajaa Field

机译:Sajaa油田连续油管欠平衡贯通油管钻井的设计基础

获取原文
获取原文并翻译 | 示例
           

摘要

This paper describes the technical basis for the design and implementation of a coiled-tubing (CT) underbalanced drilling (UBD) campaign in the Sajaa field in Sharjah, UAE. The campaign calls for up to three multilaterals per well to be drilled underbalanced from the existing wells' through tubing. The paper describes the analysis, modeling, and result, and their implication in the selection of the operational approach. The key issues associated with the campaign, many of which were unique and challenging within the context of UBD, are discussed, with specific reference to the Sajaa-3 well, which was the first candidate. These include 1. Temperature modeling and thermal considerations because of the high bottomhole temperature (BHT). 2. Compositional pressure/volume/temperature (PVT) behavior of the produced fluid. 3. Feasibility, underbalanced operability, and controllability of through-tubing UBD operations. 4. Risk to underbalance from near-wellbore depletion of the reservoir caused by long-term production from the motherbore. 5. Estimation and impact of the productivity of the motherbore and open laterals while drilling subsequent laterals. 6. Risk from reservoir parameter uncertainties. 7. Hole-cleaning risks. 8. Designing for zero flare. 9. Consideration of mechanical and hydraulic limitations to the drillable lengths. 10. Equipment limitations. The paper details the analysis approach used, assumptions made, models used, and the results. It should be noted that the Sajaa produced fluid is a retrograde condensate and the inflow performance was nonlinear and, therefore, consideration of these in the basis of design (BOD) becomes critical. The goal of this work was not only to create the technical BOD for the well, Sajaa-3, but also to set the parametric limitations for a wide range of well types that were likely to be encountered in the continuation of the campaign. On the basis of this work, an approach to drilling and monitoring the well to minimize the risks was developed, and it formed the basis of the drilling operation. The ongoing campaign, now well past 30 wells, has been one of the most successful applications of CT UBD. The results of the drilling operation of Sajaa-3 and the subsequent wells and their implications to the design basis are also discussed.
机译:本文介绍了在阿联酋沙迦的Sajaa油田设计和实施连续油管(CT)欠平衡钻井(UBD)活动的技术基础。该运动要求通过油管从现有油井中钻出欠平衡的每口井最多三个多边井。本文描述了分析,建模和结果,以及它们在选择操作方法时的含义。讨论了与该运动相关的关键问题,其中许多问题在UBD范围内是独特且具有挑战性的,并特别提到了第一个候选对象Sajaa-3井。其中包括1.由于高井底温度(BHT),因此需要进行温度建模和热考虑。 2.采出流体的成分压力/体积/温度(PVT)行为。 3.通过管道进行的UBD操作的可行性,欠平衡的可操作性和可控制性。 4.由于母井的长期开采,储层近井眼枯竭可能导致失衡的风险。 5.在钻探随后的分支时,对母孔和开放分支的生产率进行估算和影响。 6.来自储层参数不确定性的风险。 7.孔清洁风险。 8.设计零耀斑。 9.考虑机械和液压限制可钻长度。 10.设备限制。本文详细介绍了所使用的分析方法,所做的假设,所使用的模型以及结果。应当指出,萨哈生产的流体是逆行凝析油,流入性能是非线性的,因此,在设计(BOD)的基础上加以考虑就变得至关重要。这项工作的目标不仅是为Sajaa-3油井创建技术BOD,而且还为继续进行该活动可能遇到的多种油井类型设定了参数限制。在这项工作的基础上,开发了一种钻井和监测井以最大程度降低风险的方法,它构成了钻井作业的基础。目前正在进行的活动已经超过了30口井,这已成为CT UBD最成功的应用之一。还讨论了Sajaa-3和后续井的钻井操作结果及其对设计基础的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号