首页> 外文期刊>SPE Drilling & Completion >Optimization of Big-Bore HP/HT Wells to Exploit a Low-Pressure Reservoir in Indonesia
【24h】

Optimization of Big-Bore HP/HT Wells to Exploit a Low-Pressure Reservoir in Indonesia

机译:优化大口径HP / HT井以开发印度尼西亚的低压油藏

获取原文
获取原文并翻译 | 示例
           

摘要

A big-bore, high-pressure/high-temperature (HP/HT) drilling and completion program of seven wells was undertaken under challenging conditions in a low-pressure carbonate reef in Indonesia. Significant enhancements made during the program substantially reduced well times and cost. These wells incorporated the largest tubingless gas completions in the world. Higher-than-anticipated initial flow rates were achieved through an innovative strategy to decrease formation damage. The wells were completed openhole without pumping kill-weight fluids at the end of underbalanced drilling (UBD) operations. These wells are the first to combine big-bore completions, drill-in liners, and UBD in individual wellbores.
机译:在具有挑战性的条件下,印度尼西亚的低压碳酸盐岩礁进行了大口径,高压/高温(HP / HT)钻井和7口井的完井计划。该计划期间进行的重大改进显着减少了钻井时间和成本。这些井包含了世界上最大的无管天然气完井量。通过减少地层损害的创新策略,获得了超出预期的初始流量。在欠平衡钻井(UBD)操作结束时,这些井是裸眼完井的,没有泵井压井液。这些井是第一批在单个井眼中结合大口径完井,钻井衬管和UBD的井。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号