首页> 外文期刊>Space news >Jpss Ground Segment Planning Slowed by NASA Budget Shortfall
【24h】

Jpss Ground Segment Planning Slowed by NASA Budget Shortfall

机译:由于NASA预算不足,Jpss地面部分计划放缓

获取原文
获取原文并翻译 | 示例
       

摘要

A major funding shortfall is forcing NASA to defer detailed planning for phasing in the ground segment of its next-generation polar-orbiting weather satellite system in order to concentrate on making sure the basic operating system is ready in time for the launch of the first satellite late this year, an agency official said. David Schurr, deputy director of the Joint Agency Satellite Division within NASA's Science Mission Directorate, said the 2011 budget for the Joint Polar Satellite System (JPSS) is insufficient to cover the engineering work that is necessary to map out the incremental upgrades the system will need to fly multiple satellites based on two different platforms.
机译:严重的资金短缺迫使NASA推迟了对其下一代极轨气象卫星系统地面部分进行移相的详细计划,以便集中精力确保基本操作系统为第一颗卫星的发射做好准备一位机构官员说,今年下半年。美国宇航局科学任务部联合机构卫星部副主任戴维·舒尔(David Schurr)表示,“联合极地卫星系统(JPSS)”的2011年预算不足以涵盖规划该系统所需的渐进式升级所需的工程工作在两个不同的平台上飞行多颗卫星。

著录项

  • 来源
    《Space news》 |2011年第16期|p.16|共1页
  • 作者

    WARREN FERSTER;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-17 13:21:44

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号