首页> 外文期刊>Solar System Research >Primeval substance delivery from Phobos to the Earth--the Phobos-Soil project: Ballistics, navigation, and flight control
【24h】

Primeval substance delivery from Phobos to the Earth--the Phobos-Soil project: Ballistics, navigation, and flight control

机译:原始物质从火卫一传递到地球-火卫一土壤项目:弹道,导航和飞行控制

获取原文
获取原文并翻译 | 示例
       

摘要

This paper is concerned with the problems of ballistics, navigation, and flight control of the space craft (SC) in the Phobos-Grunt mission. We consider an insertion into the Earth-Mars transfer trajectory, the Earth-Mars transfer, the strategy of corrections, and the accuracy of the insertion of the SC into Martian orbit. During the orbital maneuvering stage in the sphere of influence of Mars, we set up a scheme that allows for the insertion of the SC, with the prescribed accuracy, into a point 80-km above the Phobos surface over the theoretical landing area. We specify the sequence for a controlled landing and provide methods for solving the problems of navigation and control during a self-c ontained landing. We also consider the liftoff from Phobos, insertion into the parking orbit, and the Mars-Earth transfer.[PUBLICATION ABSTRACT]
机译:本文关注的是Phobos-Grunt任务中航天器(SC)的弹道,导航和飞行控制问题。我们考虑了插入地球-火星转移轨迹,地球-火星转移,校正策略以及将SC插入火星轨道的准确性。在火星影响范围内的轨道操纵阶段,我们建立了一个方案,该方案允许以规定的精度将SC插入理论着陆区火卫一表面上方80公里处。我们指定了受控着陆的顺序,并提供了解决自举式着陆过程中导航和控制问题的方法。我们还考虑了从火卫一的升空,插入停车轨道以及火星-地球转移。[出版物摘要]

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号