Dealing with the implementation of ramp-rate control strategies - Challenges and solutions to enable PV plants with energy storage systems to operate correctly

机译:应对斜坡率控制策略的实施-挑战和解决方案,以使带有储能系统的光伏电站正常运行

获取原文
获取原文并翻译 | 示例
           

摘要

Energy storage systems (ESS) have been widely proposed as a solution for smoothing out photovoltaic (PV) power fluctuations and complying with new regulations that limit the maximum fluctuation over a given period, typically 10%/min, evaluated over a shorter period of time, such as one second. Although ramp-rate control is one of the most used strategies it does require symmetric charge-discharge power capabilities, which most commercially available batteries do not have. This can lead to non-compliance with the regulations and is a problem that has not yet been sufficiently studied. Furthermore, delays in the communication system between the measurement of the actual PV power, the PLC calculation time and the battery converter response time can lead to a failure to comply with the maximum ramp rate limit, bringing to light the need for faster systems. These two problems are addressed herein, and solutions are presented and validated with 1 s experimental data from a 122.4 kWp PV array section coupled to a 100 kW/56 kWh lithium-ion battery within a 1.18 MWp PV plant in northern Spain.
机译:能量存储系统(ESS)已被广泛提议作为一种解决方案,用于消除光伏(PV)功率波动并遵守新法规,该法规限制了给定时间段内的最大波动(通常为10%/ min),并在较短的时间内进行了评估,例如一秒钟。尽管斜率控制是最常用的策略之一,但它确实需要对称的充放电功率功能,而大多数商用电池都没有这种功能。这可能导致不遵守法规,并且是尚未充分研究的问题。此外,通信系统中实际PV功率的测量,PLC计算时间和电池转换器响应时间之间的延迟可能导致无法遵守最大斜坡率限制,从而暴露了对更快系统的需求。本文解决了这两个问题,并用1 s来自122.4 kWp PV阵列部分的实验数据给出了解决方案并进行了验证,该部分与西班牙北部1.18 MWp PV工厂中的100 kW / 56 kWh锂离子电池耦合。

著录项

  • 来源
    《Solar Energy》 |2018年第7期|242-248|共7页
  • 作者单位

    Univ Publ Navarra, ISC, Dept Elect & Elect Engn, Arrosadia Campus, Pamplona 31006, Spain;

    Univ Publ Navarra, ISC, Dept Elect & Elect Engn, Arrosadia Campus, Pamplona 31006, Spain;

    Univ Publ Navarra, ISC, Dept Elect & Elect Engn, Arrosadia Campus, Pamplona 31006, Spain;

    Univ Publ Navarra, ISC, Dept Elect & Elect Engn, Arrosadia Campus, Pamplona 31006, Spain;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);美国《生物学医学文摘》(MEDLINE);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Smoothing; Power fluctuation smoothing; Ramp-rate control; Energy storage sizing; Experimental validation;