首页> 外文期刊>Signal >Defense Acquisition, Meet Moore's Law
【24h】

Defense Acquisition, Meet Moore's Law

机译:国防采购,符合摩尔定律

获取原文
获取原文并翻译 | 示例

摘要

The United States had a pressing need for a new defense capability. That was what many thought, but as is often the case in a democracy, not all agreed. The debate went on for some time, but it finally was settled, and Congress approved a large sum of money to design and field the new system. Then, there followed additional debates: How many systems are needed? What are the key performance characteristics? Who should build it? After considerable, often contentious discussion, a request for proposals was published, responses came in and there was a selection. The selection, however, was not without controversy, and a protest was lodged. Once the protest was resolved, a contract was awarded that required production be spread to six different localities in six different states. The first efforts to gather the needed construction material were unsuccessful, leading to cost overruns, schedule delays and ultimately congressional hearings. Fortunately, at the end of this long and laborious effort, the system was delivered and proved to be world-class when tested in combat against a fully capable enemy.
机译:美国迫切需要一种新的防御能力。这是许多人的想法,但在民主制国家中常常如此,并非所有人都同意。辩论进行了一段时间,但最终解决了,国会批准了大笔资金来设计和部署新系统。然后,随之而来的是其他辩论:需要多少个系统?主要性能特征是什么?谁应该建造它?经过大量的,经常是有争议的讨论之后,发布了征集建议的请求,随后出现了反馈,然后进行了选择。然而,这次选择并非没有争议,并提出了抗议。抗议得到解决后,便授予了一项合同,要求将生产的产品散布到六个不同州的六个不同地方。最初收集所需建筑材料的努力没有成功,导致成本超支,进度延误,最终导致国会听证会。幸运的是,经过漫长而艰苦的努力,该系统交付使用,并在与完全有能力的敌人进行战斗测试中证明是世界一流的。

著录项

  • 来源
    《Signal 》 |2014年第12期| 37-38| 共2页
  • 作者

    M.THOMAS DAVIS;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号