Dear readers, Matthias Ruete, the ERTMS coordinator of the European Commission, recently stated in an interview that the ERTMS route installation needs to be significantly accelerated. At present, some 6,800 km of ETCS are currently operating on the core network corridors (thus equipment has been installed on 14% of the lines). In addition, around 7,000 km are under construction on the core network corridors. If you look at the 27 EU countries, together with Norway and Switzerland, more than 41,000 km are under contract. But that is not enough, according to Matthias Ruete, to enable the many ERTMS islands to be quickly connected to form efficient corridors. In this summer issue of SIGNAL+DRAHT, we report on a number of technical issues that arise within the scope of ETCS line equipment and which may hinder the achievement of political objectives in the short term. From approval and safety management of ETCS at the national borders and error management during commissioning to ETCS projects for non-national railways, various ETCS-specific fields of action are examined. The articles on ATO over ETCS on the S-Bahn Hamburg and on ETCS L3 offer a look into the future.
机译:亲爱的读者,Matthias Ruete,欧盟委员会的ERTMS协调员最近在面试中表示,需要大大加速ERTMS路线安装。目前,大约6,800公里处的ETC目前正在核心网络走廊上运行(因此设备已安装在14%的线路上)。此外,在核心网络走廊上正在建设约7,000公里。如果您查看27个欧盟国家,与挪威和瑞士一起,超过41,000公里处于合同。但根据Matthias Ruete的说法,这是不够的,使许多ERTMS岛能够快速连接到形成高效的走廊。在这个夏天的信号+ draht问题中,我们报告了在ETCS系列设备范围内产生的一些技术问题,并且可能妨碍在短期内实现政治目标。从国家边界和错误管理的批准和安全管理,在调试到非国家铁路项目的项目中,检查各种特定的特定行动领域。在S-Bahn汉堡和ETCS上的ATO OFFS的文章提供了进入未来的看​​法。

著录项

  • 来源
    《Signal + Draht》 |2021年第8期|4-4|共1页
  • 作者

    Reinhold Hundt;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号