首页> 外文期刊>Shore and beach >Delray Beach, Florida: Forty years of dune management
【24h】

Delray Beach, Florida: Forty years of dune management

机译:佛罗里达德拉海滩:沙丘管理四十年

获取原文
获取原文并翻译 | 示例
           

摘要

The nourished beach in Delray, Florida, had no vegetation when first constructed. Through trial and error, the city has since developed and carried out a plan to restore a coastal dune ecosystem to enhance storm protection and create natural habitat. By 1972 the "City of Delray Beach" was a misnomer because the namesake beach (Figure 1) was gone... GONE. Decades of updrift inlet construction and development had sand starved the 1.3-mile public beach and three-mile city shoreline, with erosion so bad that the barrier island highway, homes and swimming pools - and indeed the local economy - were falling into the sea. The recreational beach was often unusable during winter. Rock and concrete revetments and truck hauls placing sand failed (Figure 2) until the first full-scale nourishment (using hydraulic placement from an offshore dredge) restored the beach to partial function, with a 150-foot-wide new sandy beach, in 1972.
机译:佛罗里达德尔雷(Delray)上营养丰富的海滩在最初建造时没有植被。通过反复试验,这座城市已经制定并实施了恢复沿海沙丘生态系统的计划,以增强防暴能力并创造自然栖息地。到1972年,“德拉海滩之城”被误用了,因为同名海滩(图1)已经消失了。长达数十年的向上漂移进气道的建设和开发使1.3英里长的公共海滩和3英里长的城市海岸线紧缺,侵蚀严重到屏障岛的公路,房屋和游泳池-乃至当地的经济-都掉进了大海。在冬季,休闲海滩通常不可用。岩石和混凝土护岸以及卡车拖运沙子的工作失败了(图2),直到1972年第一次全面养料(使用海上疏hydraulic的液压方式)使海滩恢复了部分功能,并在150英尺宽的新沙滩上进行了修复。

著录项

  • 来源
    《Shore and beach》 |2017年第3期|12-16|共5页
  • 作者

    Robert H. Barron;

  • 作者单位

    Coastal Management and Consulting;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号