Following the breakdown and subsequent repairs to the cooling system on her port engine, Saga Sapphire d981/37,301gt) returned to Southampton on 6 May ready to resume her schedule. Unfortunately, the three-ship event in Lisbon on 3 May did not quite run to plan, as Saga Ruby d973/24,292gt) was running a day late due to steering problems that were discovered in Southampton prior to sailing,
展开▼