...
首页> 外文期刊>Seaways >Yukon's all-cadet rig team
【24h】

Yukon's all-cadet rig team

机译:育空的全学员钻机团队

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Get those hoses out of the water,' growled the burly rig captain as USNS Yukon, the underway replenishment oiler, was giving diesel fuel marine to USS Chafee, 140-feet away. 'Do you want to embarrass us in front of this Navy ship?' In the winch shack, the operator deftly and gingerly hauled back on no. 3 saddle until the hoses were several feet over the water. 'That's it. Keep that catenary,' the rig captain bellowed. And that was the last time on that balmy Hawaiian afternoon that the hoses would go into the water during the one-hour alongside time. It was a routine operation - except for one thing.
机译:魁梧的钻井平台船长怒吼着​​,因为正在进行补给的加油机USNS Yukon正在向140英尺外的Chafee USS提供船用柴油。 “你想让我们在这艘海军舰艇前感到尴尬吗?”在绞车棚里,操作员机灵而谨慎地拖回了。 3鞍直到软管在水面上几英尺远。 '而已。保持接触网,”钻机队长吼叫。那是在那温暖的夏威夷下午最后一次,软管在一个小时内随时间流进水中。这是例行操作-除了一件事。

著录项

  • 来源
    《Seaways》 |2011年第1期|p.26|共1页
  • 作者

    William Helton;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号