首页> 外文期刊>Sea Power >Infrastructure Overhaul ASCE and Army Corps reports underscore need for alternative financing
【24h】

Infrastructure Overhaul ASCE and Army Corps reports underscore need for alternative financing

机译:基础设施大修ASCE和陆军军团报告强调了对替代融资的需求

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In its 2013 Report Card for America's Infrastructure, released on March 19, the American Society of Civil Engineers (ASCE) gave a grade of "D-" to the nation's inland waterways and a "C" to the condition of the nation's ports. Overall, the nation's "cumulative GPA," or grade point average, for infrastructure received a "D+," a slight improvement from the "D" it earned in the 2009 report.
机译:在3月19日发布的2013年美国基础设施报告卡中,美国土木工程师学会(ASCE)对美国内陆水道给予了“ D-”等级,对美国港口状况给予了“ C”等级。总体而言,美国基础设施的“累积GPA”(平均绩点)为“ D +”,与2009年报告中的“ D”相比略有改善。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号