...
首页> 外文期刊>The Science of the Total Environment >Dredging project caused short-term positive effects on lake ecosystem health: A five-year follow-up study at the integrated lake ecosystem level
【24h】

Dredging project caused short-term positive effects on lake ecosystem health: A five-year follow-up study at the integrated lake ecosystem level

机译:疏浚项目对湖生态系统健康造成短期积极影响:综合湖生态系统级别的五年后续研究

获取原文
获取原文并翻译 | 示例
           

摘要

Sediment dredging is a controversial technology for lake eutrophication control. A lengthy and holistic assessment is important to understand the effects of a dredging project on a lake ecosystem. In this study, a dredging project was followed for 5 years. To understand the variations of lake ecosystems before, during and after the project, water quality, phytoplankton, zooplanklon and benthic animal biomass were monitored; Four subindicators, including eco-exergy (Ex), structural eco-exergy (Ex(st)), buffer capacity of total phosphorus for phytoplankton (beta((TP)(phyto))) and trophic level index (TLI) were calculated and developed to an integrated ecosystem health indicator (EHI). The monitoring results showed that the dredging project caused many short-term positive effects such as decreased total nitrogen, total phosphorus, permanganate index and phytoplankton biomass throughout the entire lake water, increased Secchi disk depth in the whole lake and increased benthonic animal biomass in the nondredged regions. However, these positive effects disappeared overtime. Water chemistry and biomass returned to the initial state before dredging. EHI showed that the dredging project caused negative effects on the lake health in the dredged region at first. Subsequently, the health status of the entire lake, including the dredged and nondredged regions, improved until 1-2 years after the project finished. Because of the lack of other timely ecological restoration measures, the lake gradually returned to its initial health status. However, the health status in the dredged regions was only slightly better than before dredging and often worse than that of the nondredged regions. Our study suggested that dredging projects may only cause short-term positive effects on lake ecosystem health. The external interception and dredging ratio were important. A dredging project should be combined with other ecological lake restoration measures when the project has caused positive effects in a lake. (C) 2019 Elsevier B.V. All rights reserved.
机译:沉积物疏浚是湖泊富营养化控制的争议技术。漫长而全面的评估对于了解疏浚项目对生态系统的影响非常重要。在这项研究中,疏浚项目遵循5年。要了解项目,期间和之后的湖泊生态系统的变化,监测水质,植物,浮游植物,浮游生物和底栖动物生物质;四个潜水器,包括生态驱动(EX),结构eCO-Deerergy(EX(ST)),计算浮游植物总磷(β(TP)(PHYTO)))和营养水平指数(TLI)的缓冲能力发展到综合生态系统健康指标(EHI)。监测结果表明,疏浚项目造成了许多短期正效应,如整个湖水中的总氮,总磷,高锰酸盐指数和浮游植物生物质量,在整个湖泊中增加了Secchi磁盘深度,并增加了膨胀的动物生物量增加不排名的地区。但是,这些积极影响消失了加班。在疏浚之前,水化学和生物量返回初始状态。 EHI表明,疏浚项目起初对疏浚地区的湖泊健康产生了负面影响。随后,整个湖泊的健康状况,包括疏浚和不排名的地区,直到项目完成后1-2岁。由于缺乏其他及时的生态恢复措施,湖泊逐渐恢复到其初始健康状况。然而,疏浚地区的健康状况略微略微疏浚前略微好,并且经常比不排名地区的地区更糟糕。我们的研究表明,疏浚项目只会对生态系统健康造成短期积极影响。外部拦截和疏浚比率很重要。当项目导致湖泊中的积极效果导致疏浚工程,疏浚项目应与其他生态湖泊恢复措施相结合。 (c)2019 Elsevier B.v.保留所有权利。

著录项

  • 来源
    《The Science of the Total Environment》 |2019年第10期|753-763|共11页
  • 作者单位

    Southwest Minzu Univ Coll Chem & Environm Protect Engn Chengdu 610041 Sichuan Peoples R China;

    Southwest Minzu Univ Coll Chem & Environm Protect Engn Chengdu 610041 Sichuan Peoples R China;

    Southwest Minzu Univ Coll Chem & Environm Protect Engn Chengdu 610041 Sichuan Peoples R China;

    Southwest Minzu Univ Coll Chem & Environm Protect Engn Chengdu 610041 Sichuan Peoples R China;

    Chinese Acad Sci Inst Hydrobiol State Key Lab Freshwater Ecol & Biotechnol Wuhan 430072 Hubei Peoples R China;

    Chinese Acad Sci Inst Hydrobiol State Key Lab Freshwater Ecol & Biotechnol Wuhan 430072 Hubei Peoples R China;

    Chinese Acad Sci Inst Hydrobiol State Key Lab Freshwater Ecol & Biotechnol Wuhan 430072 Hubei Peoples R China;

    Chinese Acad Sci Inst Hydrobiol State Key Lab Freshwater Ecol & Biotechnol Wuhan 430072 Hubei Peoples R China;

    Chinese Acad Sci Inst Hydrobiol State Key Lab Freshwater Ecol & Biotechnol Wuhan 430072 Hubei Peoples R China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Dredging project; Lake ecosystem health; Ecological indicator; Lake eutrophication; Water quality; Biomass;

    机译:疏浚项目;湖生态系统健康;生态指标;湖富营养化;水质;生物量;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号