...
首页> 外文期刊>Science of the total environment >Fifteen-year assessment of a permeable reactive barrier for treatment of chromate and trichloroethylene in groundwater
【24h】

Fifteen-year assessment of a permeable reactive barrier for treatment of chromate and trichloroethylene in groundwater

机译:渗透性反应屏障对地下水中铬酸盐和三氯乙烯处理的十五年评估

获取原文
获取原文并翻译 | 示例

摘要

The fifteen-year performance of a granular iron, permeable reactive barrier (PRB; Elizabeth City, North Carolina) is reviewed with respect to contaminant treatment (hexavalent chromium and trichloroethylene) and hydraulic performance. Due to in-situ treatment of the chromium source zone, reactive and hydraulic longevity of the PRB has outlived the mobile chromate plume. Chromium concentrations exceeding 3 μg/L have not been detected in regions located hydraulically down-gradient of the PRB. Trichloroethylene treatment has also been effective, although non-constant influent concentrations of trichloroethylene have at times resulted in incomplete dechlori-nation. Daughter products: cis- 1,2-dichloroethylene, vinyl chloride, ethene, and ethane have been observed within and down-gradient of the PRB at levels <10% of the influent trichloroethylene. Analysis of potentiometric surfaces up-gradient and across the PRB suggests that the PRB may currently represent a zone of reduced hydraulic conductivity; however, measurements of the in-situ hydraulic conductivity provide values in excess of 200 m/d in some intervals and indicate no discernible loss of bulk hydraulic conductivity within the PRB. The results presented here are particularly significant because they provide the longest available record of performance of a PRB. The longevity of the Elizabeth City PRB is principally the result of favorable groundwater geochemistry and hydrologic properties of the site.
机译:就污染物处理(六价铬和三氯乙烯)和水力性能方面,对颗粒状铁质可渗透反应性屏障(PRB;北卡罗来纳州伊丽莎白市)的十五年性能进行了回顾。由于对铬源区的原位处理,PRB的反应寿命和水力寿命已经超过了流动的铬酸盐羽流。在PRB的水力下降梯度区域中未检测到超过3μg/ L的铬浓度。三氯乙烯处理也很有效,尽管进水浓度不恒定有时会导致不完全脱氯。子产物:在PRB内和降级中观察到顺式1,2-二氯乙烯,氯乙烯,乙烯和乙烷,其含量低于进水三氯乙烯的10%。对电位计表面向上倾斜并横跨PRB的分析表明,PRB当前可能代表了水力传导率降低的区域;然而,现场水力传导率的测量在某些时间间隔内提供的值超过200 m / d,并且表明PRB内没有明显的整体水力传导率损失。这里提供的结果特别重要,因为它们提供了PRB性能的最长可用记录。伊丽莎白市PRB的寿命长久主要是因为该地区地下水地球化学和水文特性良好。

著录项

  • 来源
    《Science of the total environment 》 |2014年第15期| 186-194| 共9页
  • 作者单位

    United States Environmental Protection Agency, National Risk Management Research Laboratory, Ground Water and Ecosystems Restoration Division, 919 Kerr Research Drive, Ada, OK, 74820, USA;

    United States Environmental Protection Agency, National Risk Management Research Laboratory, Ground Water and Ecosystems Restoration Division, 919 Kerr Research Drive, Ada, OK, 74820, USA;

    United States Environmental Protection Agency, National Risk Management Research Laboratory, Ground Water and Ecosystems Restoration Division, 919 Kerr Research Drive, Ada, OK, 74820, USA;

    Oklahoma Water Survey, University of Oklahoma, 301 David L. Boren Blvd., Norman, OK 73019, USA;

    United States Environmental Protection Agency, National Risk Management Research Laboratory, Ground Water and Ecosystems Restoration Division, 919 Kerr Research Drive, Ada, OK, 74820, USA;

    U.S. Coast Guard Base Elizabeth City, 1664 Weeksville Road, Bldg 981, Elizabeth City, NC, 27909, USA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Permeable reactive barrier; Granular iron; Long-term performance; Chromium; Trichloroethylene; Groundwater remediation;

    机译:渗透性反应屏障粒状铁;长期表现;铬;三氯乙烯;地下水修复;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号