...
首页> 外文期刊>Science and technology of nuclear installation >Uncertainty and Sensitivity of Neutron Kinetic Parameters in the Dynamic Response of a PWR Rod Ejection Accident Coupled Simulation
【24h】

Uncertainty and Sensitivity of Neutron Kinetic Parameters in the Dynamic Response of a PWR Rod Ejection Accident Coupled Simulation

机译:压水堆杆射出事故耦合响应动态响应中子动力学参数的不确定性和敏感性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In nuclear safety analysis, it is very important to be able to simulate the different transients that can occur in a nuclear power plant with a very high accuracy. Although the best estimate codes can simulate the transients and provide realistic system responses, the use of nonexact models, together with assumptions and estimations, is a source of uncertainties which must be properly evaluated. This paper describes a Rod Ejection Accident (REA) simulated using the coupled code RELAP5/PARCSv2.7 with a perturbation on the cross-sectional sets in order to determine the uncertainties in the macroscopic neutronic information. The procedure to perform the uncertainty and sensitivity (U&S) analysis is a sampling-based method which is easy to implement and allows different procedures for the sensitivity analyses despite its high computational time. DAKOTA-Jaguar software package is the selected toolkit for the U&S analysis presented in this paper. The size of the sampling is determined by applying the Wilks' formula for double tolerance limits with a 95% of uncertainty and with 95% of statistical confidence for the output variables. Each sample has a corresponding set of perturbations that will modify the cross-sectional sets used by PARCS. Finally, the intervals of tolerance of the output variables will be obtained by the use of nonparametric statistical methods.
机译:在核安全分析中,能够以非常高的精度模拟在核电站中可能发生的各种瞬变非常重要。尽管最好的估算代码可以模拟瞬变并提供逼真的系统响应,但是使用不精确的模型以及假设和估算是不确定性的来源,必须对其进行适当的评估。本文描述了使用耦合代码RELAP5 / PARCSv2.7进行模拟的杆射出事故(REA),并在横截面上设置了扰动,以便确定宏观中子电子信息的不确定性。进行不确定度和灵敏度(U&S)分析的过程是一种基于采样的方法,该方法易于实现,尽管计算时间长,但允许使用不同的方法进行灵敏度分析。 DAKOTA-Jaguar软件包是本文介绍的用于U&S分析的选定工具包。抽样的大小是通过对双公差极限应用Wilks公式确定的,其中不确定度为95%,输出变量的统计置信度为95%。每个样本都有一组相应的扰动,这些扰动将修改PARCS使用的横截面集。最后,将通过使用非参数统计方法获得输出变量的公差区间。

著录项

  • 来源
    《Science and technology of nuclear installation》 |2012年第2期|625878.1-625878.10|共10页
  • 作者单位

    Institute for the Industrial, Radiophysical and Environmental Safety (ISIRYM), Universitat Politecnica de Valencia, 46022 Valencia, Spain;

    Institute for the Industrial, Radiophysical and Environmental Safety (ISIRYM), Universitat Politecnica de Valencia, 46022 Valencia, Spain;

    Institute for the Industrial, Radiophysical and Environmental Safety (ISIRYM), Universitat Politecnica de Valencia, 46022 Valencia, Spain;

    Institute for the Industrial, Radiophysical and Environmental Safety (ISIRYM), Universitat Politecnica de Valencia, 46022 Valencia, Spain;

    Applied Statistics, Operations Research and Quality Department, Universitat Politecnica de Valencia (UPV), Cami de Vera, s, 46022 Valencia, Spain;

    Lehrstuhl fuer Nukleartechnik, Technische Universitaet Muenchen (TUM), Boltzmannstrasse 15, 85747 Garching, Germany;

    Institute for the Industrial, Radiophysical and Environmental Safety (ISIRYM), Universitat Politecnica de Valencia, 46022 Valencia, Spain;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号