首页> 外文期刊>Science in China. Series E, Technological sciences >Two new reinforcement techniques applicable in high steep slopes along the Chengdu-Lhasa Highway, Southwest China
【24h】

Two new reinforcement techniques applicable in high steep slopes along the Chengdu-Lhasa Highway, Southwest China

机译:两种新的加固技术,适用于中国西南成都至拉萨公路的高陡坡度

获取原文
获取原文并翻译 | 示例
       

摘要

Anti-slide pile and anchoring hole are two types of reinforcement techniques popularly used in slope reinforcement. However, some defects of these two techniques are found in slope engineering practices. Utilizing higher tensile strength of pre-stressed structures, the authors devise two new types of slope reinforcement techniques, i.e. pre-stressed anchoring beam and pre-stressed anti-slide pile, in an attempt to overcome those defects of the existing techniques. These two new techniques are characterized by gathering multiple functions, e.g. engineering investigation, reinforcement, drainage, monitoring and strength supplement, so as to achieve high reinforcement efficiency, convenient checking, and higher ratio of function to cost. It is hoped that, if applying these two new techniques in remedies of landslide hazards along the Chengdu-Lhasa Highway, better reinforcement effects will be obtained.
机译:防滑桩和锚固孔是边坡加固中普遍使用的两种加固技术。但是,在边坡工程实践中发现了这两种技术的一些缺陷。利用预应力结构的较高抗拉强度,作者设计了两种新型的边坡加固技术,即预应力锚固梁和预应力抗滑桩,以试图克服现有技术的这些缺陷。这两种新技术的特征在于收集了多种功能,例如工程勘察,加固,排水,监测和强度补强,以达到较高的加固效率,方便的检查以及较高的功能成本比。希望将这两种新技术应用于成拉高速公路沿线滑坡灾害的治理,能够获得较好的加固效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号