首页> 外文期刊>Science in China. Series E, Technological sciences >Study on the grooundwater exploitation test in the Yellow River lower reaches ―A case study on the north suburb waterworks of Zhengzhou, China
【24h】

Study on the grooundwater exploitation test in the Yellow River lower reaches ―A case study on the north suburb waterworks of Zhengzhou, China

机译:黄河下游地下水开发试验研究-以郑州北郊自来水厂为例

获取原文
获取原文并翻译 | 示例
       

摘要

This paper presents the studies on groundwater resources potential of the Yellow River (YR) terrace in Zhengzhou area, China. The main aim of the research was to resolve water shortage problems induced by recent but frequent drying ups of the YR in its lower reaches. Geologic explorations and grouped-pumping tests were conducted in the area. Based on collected data a groundwater flow net was established. The buried depth of groundwater level and water bearing potential of the aquifers were evaluated. Conventional method was used to determine recharge of the groundwater by lateral infiltration of the YR in pumping patterns. The results show that the study region has a high water bearing potential and offers conditions for the construction of large water works. However, only limited recharge by lateral infiltration from the river is available when developing large scale groundwater exploitation in the riverside of the YR. Environmental impacts induced by embankment stability of the Great dyke of the YR could be minimized or eliminated by appropriate engineering methods.
机译:本文介绍了中国郑州地区黄河梯田的地下水资源潜力。该研究的主要目的是解决因黄河下游河段近期但频繁干drying而引起的缺水问题。该地区进行了地质勘探和成组抽水试验。基于收集的数据,建立了地下水流网。评估了地下水位的埋深和含水层的含水潜力。使用常规方法通过泵送模式中YR的侧向渗透来确定地下水的补给。结果表明,该研究区具有较高的含水潜力,为大型水厂的建设提供了条件。但是,在黄河的河岸开发大规模的地下水开采时,只能通过河水的侧向渗透获得有限的补给。可以通过适当的工程方法来最小化或消除由黄河大堤堤防稳定性引起的环境影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号