...
首页> 外文期刊>Rotor & Wing >Bell 525 Moves to Next Flight Test Phase
【24h】

Bell 525 Moves to Next Flight Test Phase

机译:贝尔525进入下一飞行测试阶段

获取原文
获取原文并翻译 | 示例
           

摘要

Bell Helicopter moved the 525 Relentless prototype Dec. 1 from its Amarillo, Texas, assembly site to the XworX research and development facility near the company's Fort Worth headquarters for the next phase of flight tests. It was scheduled to remain in testing, including validation of hover performance in and out of ground effect, at its Arlington, Texas, Municipal Airport facility through Dec. 31. At press time, that aircraft had accumulated 60 of 1,500 planned flight test hours. Bell said it already had completed testing up to the 525's never-exceed speed (VNE) at most flight envelope extremes and expanded the maneuvering envelope out to 0.5 and 2 g. The company said it also had achieved the 525's targeted maximum bank angle in level turns, achieved power-off VNE and demonstrated max power-off bank angles and aircraft maneuverability.
机译:贝尔直升机公司于12月1日将525 Relentless原型机从其德克萨斯州阿马里洛的装配基地移至公司沃思堡总部附近的XworX研发机构,以进行下一阶段的飞行测试。该飞机原定在12月31日之前在其位于德克萨斯州阿灵顿市机场的设施中进行测试,包括验证悬停性能在地面和地面的影响。截至发稿时,该飞机已累计计划1,500个飞行测试小时中的60个。贝尔说,它已经完成了在大多数飞行包线极限情况下,直至525的从未超过速度(VNE)的测试,并将机动包线扩大到0.5和2 g。该公司表示,它还已经在水平转弯上实现了525的目标最大倾斜角,实现了关机VNE,并展示了最大关机角和飞机的可操纵性。

著录项

  • 来源
    《Rotor & Wing》 |2016年第1期|14-14|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号