...
首页> 外文期刊>Rocky Mountain Construction >Animas-La Plata Underway At Last
【24h】

Animas-La Plata Underway At Last

机译:动漫-拉普拉塔最后进行中

获取原文
获取原文并翻译 | 示例
           

摘要

Work is finally underway on what is billed as the Bureau of Reclamation's last great Western dam project, the long-awaited Ani-mas-La Plata Project near Durango, Colo. With virtually no fanfare, work began this spring with site preparation for the Durango pumping plant that will lift water from the Animas River into Ridges Basin Reservoir some two miles and 510 feet uphill from the plant. Indian tribes. The latter beneficiaries would have century-old water rights claims settled by construction of the originally envisioned dams and reservoirs. As first designed, with a dam and reservoir on both its namesake rivers, Animas-La Plata would have cost an estimated $710 million. Strong opposition, even from the federal government during the Clinton administration, led to major downsizing of the project, project will provide water only for municipalities and the two Indian tribes (who must build their own facilities to access the water stored in Ridges Basin Reservoir).
机译:垦殖局最后一个大型西部水坝项目,即期待已久的科罗拉多州杜兰戈附近的Ani-mas-La Plata项目,终于开工了,实际上没有大张旗鼓,今年春天开始了杜兰戈的现场准备工作抽水厂,它将把水从阿尼马斯河提至山脊盆地水库,距工厂约两英里和510英尺。印度部落。后者的受益者可以通过建造最初设想的水坝和水库来解决具有百年历史的水权主张。按照最初的设计,阿尼玛斯-拉普拉塔在两条同名河流上都设有水坝和水库,估计耗资7.1亿美元。甚至在克林顿政府执政期间,来自联邦政府的强烈反对导致该项目的规模大大缩小,该项目将仅为市政当局和两个印第安部落(他们必须建造自己的设施以获取储存在里奇斯盆地水库中的水)提供水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号