Three GOMACO Commander Ills were at work on a 19-phase project in Palm Valley, Ariz. Petra Contracting was responsible for slipforming approximately 160,000 lineal ft of curb and gutter and monolithic sidewalk with curb and gutter. One Commander Ⅲ was responsible for the 6-in. vertical curb and gutter on the project. A second machine slipformed a monolithic 3-ft roll curb with a 5-ft-wide sidewalk. The third also was slipforming monolithic with a 2-ft roll curb and 5-ft-wide sidewalk. Three machines with three crews were all at work on the same project, at the same time.
机译:三个GOMACO指挥官疾病正在亚利桑那州棕榈谷的19个阶段项目中进行,Petra Contracting负责对约160,000英尺的路缘和天沟以及整块人行道和路缘和天沟进行滑模成型。 6英寸步枪由一名Ⅲ号指挥官负责。垂直路缘和天沟在项目上。第二台机器将整块3英尺宽的人行横道和5英尺宽的人行道滑模成型。第三个也是单块成型,带有2英尺的防滚架和5英尺宽的人行道。由三名工作人员组成的三台机器同时在同一项目上工作。

著录项

  • 来源
    《Roads & bridges》 |2008年第7期|p.47|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 公路运输;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号