...
首页> 外文期刊>Roads & bridges >Preventing roadway washouts
【24h】

Preventing roadway washouts

机译:防止道路冲刷

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

When a road turns into a raging river, it becomes both dangerous and damaging. This is exactly what happened in July 2013, when the city of Lebanon, N.H., was swamped with more than 4 in. of rain within 48 hours-2 in. fell in just 45 minutes. The deluge caused flash flooding which left residents stranded and cost $6.5 million in infrastructure damage. The biggest chunk-$3.4 million-was slated to repair Slayton Hill Road, which was washed out during the storm. According to city officials, washouts on this road had been an ongoing problem. Stantec Engineering (formerly Fay, Spofford & Thorndike) was asked by the city to assist with the design of emergency repairs and tasked with coming up with a more resilient solution.
机译:当道路变成汹涌的河流时,既危险又具有破坏性。这恰好是2013年7月发生的事情,当时新罕布什尔州黎巴嫩市在48小时内就淹没了超过4英寸的降雨,而仅仅45分钟就降落了2英寸。洪水造成山洪泛滥,使居民滞留,基础设施损失达650万美元。最大的一笔款项(340万美元)原定用于维修Slayton Hill公路,该公路在暴风雨期间被冲刷了。据市政官员称,这条路上的冲刷一直是一个持续的问题。该市要求Stantec Engineering(以前的Fay,Spofford和Thorndike)协助进行紧急维修设计,并提出一个更具弹性的解决方案。

著录项

  • 来源
    《Roads & bridges》 |2017年第4期|54-54|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号