首页> 外文期刊>RIBA journal >WE'VE BEEN FRAMED
【24h】

WE'VE BEEN FRAMED

机译:我们已经陷害了

获取原文
获取原文并翻译 | 示例
           

摘要

Frameworks are no guarantee of volume or value of work, but their steadying cash-flow benefits do help counterbalance the more 'spiky'effects of larger one-off capital projects. This has certainly helped gbs architects to build a sustainable workforce with very low rates of staff 'churn'. Based in Oxford, we signed a one-year pilot with the Oxford Radcliffe Hospitals NHS Trust in 2001. This resulted in a six-year relationship that delivered more than 167 completed projects, worth £33m, which improved clinical facilities and patient welfare. Schemes ranged from the £6m refurbishment of laboratories to designing a £20m neo-natal unit. The framework agreement has been renewed until 2016.
机译:框架不能保证工作量或价值,但框架的稳定现金流量收益确实有助于抵消较大的一次性资本项目的“尖峰”效应。这无疑帮助gbs建筑师构建了具有低员工流失率的可持续劳动力。总部位于牛津,我们于2001年与牛津拉德克利夫医院NHS信托基金签署了为期一年的试点计划。这导致了长达6年的合作关系,交付了167多个已完成项目,价值3300万英镑,改善了临床设施和患者福利。计划的范围从600万英镑的实验室翻新到设计2,000万英镑的新生儿病房。框架协议已续签至2016年。

著录项

  • 来源
    《RIBA journal》 |2010年第2期|64|共1页
  • 作者

    Nigel Spawton;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号