In the absence of any agreement over fees, how should a proper fee for an architect be assessed? What if its services have fallen far short of the standards expected? And how far can an architect go to recover those fees? A recent case (Michael Phillips Architects Ltd v Riklin) dealt with just these issues in a situation where no appointment document had been signed between the architect and the client, nor was there any agreement on fees. The project was the renovation and refurbishment of a residential listed building in Hampshire. The Riklins were people with no experience of construction projects, and expected their architect to provide a full set of services for the project.
机译:在没有就费用达成任何协议的情况下,应如何评估建筑师的适当费用?如果其服务远远达不到预期的标准怎么办?建筑师可以走多远才能收回这些费用?在最近的案例(Michael Phillips Architects Ltd诉Riklin)中,只有在建筑师与客户之间没有签署任命文件,也没有任何费用协议的情况下,才处理这些问题。该项目是对汉普郡一栋民居建筑的翻新和翻新。 Riklin人是没有建设项目经验的人,并期望他们的建筑师为该项目提供全套服务。

著录项

  • 来源
    《RIBA Journal》 |2011年第6期|p.76|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 00:22:02

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号