首页> 外文期刊>RIBA Journal >Home design rearranged
【24h】

Home design rearranged

机译:家居设计重新排列

获取原文
获取原文并翻译 | 示例
       

摘要

Last summer the Ministry of Housing, Communities & Local Government allocated £900 million to more than 300 'shovel-ready' projects to drive economic recovery and deliver up to 45,000 homes, as well as infrastructure projects. But a report by property consultant Savills for housing charity Shelter estimates that this year 171,000 new homes will be delivered in England, around a third down on last year's total. The report, Impact of Covid-19 on Social Housing Supply and Residential Construction, says that economic ripples from the pandemic could see 15% fewer homes built over the next five years and foresees increased overcrowding in both the social and private rented sectors.
机译:去年夏天,住房,社区和地方政府拨款9亿英镑以上的300多百万英镑的项目,以推动经济复苏,并提供高达45,000所房屋,以及基础设施项目。但房地产顾问萨利特为住房慈善住所的报告估计,今年171,000人的新房将在英格兰提供,而不是去年的三分之一。该报告,Covid-19对社会住房供应和住宅建设的影响,说流行病的经济涟漪可能会看到未来五年内建造的15%,预见到社会和私人租用的行业的过度拥挤。

著录项

  • 来源
    《RIBA Journal》 |2020年第11期|52-54|共3页
  • 作者

    Josephine Smit;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号