首页> 外文期刊>Reviews in engineering geology. >Sediment impacts from the Savage Rapids Dam removal, Rogue River, Oregon
【24h】

Sediment impacts from the Savage Rapids Dam removal, Rogue River, Oregon

机译:俄勒冈州Rogue River的Savage Rapids大坝拆除带来的泥沙影响

获取原文
获取原文并翻译 | 示例
       

摘要

Before a dam removal project is implemented, engineers are often asked to estimate the potential for impacts from the release of reservoir sediment. Field measurements, numerical models, and physical models are typically used to develop sediment impact estimates. This information helps decision makers to make informed decisions about when and how to remove the dam, whether to allow the river to erode the reservoir sediment, or to remove or stabilize the reservoir sediment prior to dam removal, or whether mitigation of the effects is needed. Although numerous dams have been removed, mostly small in size, few case studies on sediment impacts have been documented. Because there are limited case studies, dam removal regulators and stakeholders often err on the side of caution when selecting the level of preremoval analysis or determining whether the reservoir sediment needs to be removed prior to dam removal. The purpose of this paper is to increase our knowledge base for application to future dam removals. The chapter discusses sediment impacts associated with the removal of the 11.9-m-high Savage Rapids Dam on the Rogue River near Grants Pass, Oregon. A unique factor to the Savage Rapids project was the construction and operation of a new diversion facility and water intake located immediately downstream of the dam, which introduced additional consequences associated with the release of reservoir sediment.
机译:在实施大坝拆除项目之前,经常会要求工程师估算水库沉积物释放的潜在影响。通常使用现场测量,数值模型和物理模型来开发沉积物影响估算。这些信息可帮助决策者就何时以及如何拆除大坝,是否允许河流侵蚀水库沉积物,在拆除大坝之前清除或稳定水库沉积物,或者是否需要减轻影响做出明智的决定。 。尽管已拆除了许多水坝,但大都是小坝,但有关泥沙影响的案例研究却很少。由于案例研究有限,因此在选择拆除前的分析水平或确定在拆除大坝之前是否需要拆除水库沉积物时,拆除大坝的管理人员和利益相关者通常会谨慎行事。本文的目的是增加我们的知识基础,以应用于将来的大坝拆除。本章讨论了与拆除俄勒冈州格兰茨帕斯附近的罗格河上11.9米高的萨维奇急流坝有关的泥沙影响。 Savage Rapids项目的一个独特因素是新的引水设施的建设和运营以及紧接大坝下游的取水口,这带来了与水库沉积物释放相关的其他后果。

著录项

  • 来源
    《Reviews in engineering geology.》 |2013年第2013期|93-104|共12页
  • 作者单位

    Bureau of Reclamation, Technical Service Center, Denver, Colorado 80225, USA;

    Bureau of Reclamation, Technical Service Center, Denver, Colorado 80225, USA;

    Bureau of Reclamation, Technical Service Center, Denver, Colorado 80225, USA;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号