...
首页> 外文期刊>Resource recycling >Recycled fiber mill coming, existing plant sold
【24h】

Recycled fiber mill coming, existing plant sold

机译:再生纤维厂即将来临,现有工厂已出售

获取原文
获取原文并翻译 | 示例
           

摘要

A recycled containerboard mill is in development in New York state, with plans to start up in 2021 and process 300,000 tons per year of OCC. The project is being developed by CorrVentures, a private firm that has worked on previous projects in the pulp, paper and corrugated packaging sector, according to a May 24 press release. The mill, a 100% recycled lightweight container-board facility will be sited on a 102-acre brown-field location near Albany, N.Y. It's currently being referred to as the Hudson Valley Paperboard Project.
机译:纽约州正在开发一个回收的集装箱板纸厂,计划于2021年启动,每年处理30万吨的OCC。根据5月24日的新闻稿,该项目由一家私人公司CorrVentures开发,该公司曾在纸浆,造纸和瓦楞纸包装领域开展过先前的项目。该工厂是100%可回收的轻质集装箱板工厂,将位于纽约州奥尔巴尼附近102英亩的棕地上,目前被称为哈德逊谷纸板项目。

著录项

  • 来源
    《Resource recycling》 |2019年第7期|10-10|共1页
  • 作者

    Colin Staub;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号