...
首页> 外文期刊>Research in transportation economics >Engaging the paratransit sector in Cape Town on public transport reform: Progress, process and risks
【24h】

Engaging the paratransit sector in Cape Town on public transport reform: Progress, process and risks

机译:让开普敦的辅助运输部门参与公共交通改革:进展,过程和风险

获取原文
获取原文并翻译 | 示例
           

摘要

The South African government in 2006 initiated an urban public transport reform programme reliant on the introduction of new bus rapid transit (BRT) systems. Affected paratransit operators can opt to be incorporated in these systems by forming new operating companies, but must withdraw their existing services from proposed routes. Cape Town's first phase of BRT operations came online in 2011, and operator engagement has focussed on this phase. The attitudes within this city's paratransit sector in relation to future phases, and to the broader reform policy, remain largely untested. In view of this sector's past resistance to government-led proposals, and the current phase avoiding areas with the highest concentrations of operators, the current engagement process's outcomes may not be adequate indicators of future prospects. In this paper the authors discuss the details of the offer that has been made to paratransit operators, progress towards finalising negotiations around that offer, risk factors inherent in the current approach to engagement, and issues that have emerged around the reform programme - insofar as it affects and involves paratransit - which may impact upon future phases of the reform programme. These emerging issues include: the feasibility of continued financial compensation for withdrawing existing operating permissions in view of broader fiscal concerns around BRT implementation; a lack of insight into the fundamental factors driving the responses of paratransit operators and associations to the reform programme; and concerns around a national public transport reform policy that may not be sufficiently grounded in the local contexts within which municipalities and operators function.
机译:南非政府于2006年发起了一项城市公共交通改革计划,该计划依赖于引入新的公交快速运输(BRT)系统。受影响的辅助公交运营商可以通过组建新的运营公司来选择纳入这些系统,但必须从提议的路线中撤消其现有服务。开普敦BRT运行的第一阶段于2011年上线,运营商的参与一直集中在这一阶段。这个城市的辅助运输部门对未来阶段以及更广泛的改革政策的态度在很大程度上尚未得到检验。鉴于该行业过去对政府主导的提议的抵制,并且当前阶段正在避开运营商最集中的地区,因此当前的参与过程的结果可能不足以表明未来的前景。在本文中,作者讨论了针对超公交运营商的报价细节,围绕该报价完成谈判的进展,当前参与方式固有的风险因素以及围绕改革计划出现的问题-就此而言影响并涉及超运输-可能会影响改革计划的未来阶段。这些新出现的问题包括:鉴于围绕BRT实施产生的更广泛的财政关注,继续撤销现有运营许可的财务补偿的可行性;对推动辅助公交运营者和协会对改革计划做出反应的基本因素缺乏见识;以及对国家公共交通改革政策的担忧,而该政策可能无法在市政当局和运营商所处的当地环境中充分扎根。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号