...
机译:UKM案例研究中导致延迟项目建设的因素
Fundamental Studies of Engineering Unit, The National University of Malaysia, Malaysia;
Department of Civil and Structural Engineering, The National University of Malaysia, Malaysia;
Department of Civil and Structural Engineering, The National University of Malaysia, Malaysia;
Department of Civil and Structural Engineering, The National University of Malaysia, Malaysia;
Department of Civil and Structural Engineering, The National University of Malaysia, Malaysia;
Department of Civil and Structural Engineering, The National University of Malaysia, Malaysia;
Construction project; causes of construction delay; ninth Malaysian plan projects; Relative Important Index (RII);
机译:UKM案例研究中导致延迟项目建设的因素
机译:影响布基纳法索公共建设项目进度拖延因素的实证研究
机译:促进建筑项目表现不佳的因素:沙特阿拉伯的研究
机译:业主对项目延误有助于的因素的看法:沙特阿拉伯道路和桥梁项目案例研究
机译:评估知识转移对建筑项目交付项目延误的影响:定性案例研究
机译:多学科区域审计可以确定有助于死产的可避免因素和延误吗?回顾性队列研究
机译:影响建筑工程延误和索赔的因素分析
机译:海地重建:导致美国国际开发署基础设施建设延误的因素