Self-adjusting latching of Additional Centre Tank (ACT)

机译:额外中心罐的自调节锁定(ACT)

获取原文
获取原文并翻译 | 示例
       

摘要

A correct installation of the Additional Center Tank (ACT) into the fuselage cargo compartment is an important topic tor safety. Sate operation is ensured by low tolerances, the main concern is proper installation of the ACT to limit possible movement during flight. The following idea can be applied on ACT installation for all programs of Airbus Commercial. The current procedure to install the ACT into the aircraft cargo compartment is to phase the aircraft out of the Final Assembly Line. The installation procedure is very time consuming: The installation of an ACT consists of 2 Steps. 1st Step: Measurement of existing gaps between latches and ACT. 2nd Step: Adjustment by shimming of gaps to fulfill drawing tolerance definitions. Further to the procedure itself is very time consuming and interrupts the assembly flow.
机译:正确安装额外的中心罐(行动)进入机身货物舱是一个重要的主题。 SATE操作通过低公差确保,主要关注点是正确安装行动,以限制飞行期间可能的运动。以下想法可以应用于所有空中客车商业程序的ACT安装。将该行动安装到飞机货舱中的当前程序是将飞机逐步从最终装配线中逐步。安装过程非常耗时:ACT的安装由2个步骤组成。第一步:闩锁与行为之间存在的空隙。第2步:通过散布差距来调整,以满足绘图公差定义。此外,该过程本身非常耗时并中断组装流程。

著录项

  • 来源
    《Research Disclosure》 |2021年第681期|217-217|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号