...
首页> 外文期刊>Renewable & Sustainable Energy Reviews >Hydropower expansion and analysis of the use of strategic and integrated environmental assessment tools in Brazil
【24h】

Hydropower expansion and analysis of the use of strategic and integrated environmental assessment tools in Brazil

机译:巴西的水电扩张以及对战略和综合环境评估工具的使用情况分析

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

In Brazil, over the next two decades, an additional 31.7 GW will be added to the hydropower sector in the northern region, to keep pace with the country's growing economy. Due to the socio-environmental vulnerability of this region, there is international concern about its conservation. Since 2007, the hydroelectric potential inventory has employed Integrated Environmental Assessments (IEA), taking into consideration an analysis of the cumulative and synergistic impacts of all the hydropower plants in the river basin. Also available is the Strategic Environmental Assessment (SEA), a tool that has been used by the National Water Agency in its Strategic Water Resources Plan, which aims to support decision making at the political, planning, and program levels in the river basin, employing sustainable development scenarios. Both tools have been recently used in Brazil, and this paper aims to analyze their differences and their main contributions to the decision-making process in the Brazilian power sector. Therefore, we analyzed 3 studies on the implementation of new hydropower plants in the Tocantins-Araguaia River Basins: the Strategic Water Resources Plan for Tocantins and Araguaia River Basins-PERH-TA (using the SEA methodology), the LEA of the Tocantins River Basin and the IEA of the Araguaia River Basin, analyzing their methodologies, scenarios, results and recommendations. We found that the SEA, in contrast to the LEA, provides a broader and more independent vision about the social and environmental impacts. After the conclusion of the integrated and strategic studies, we verified that some recommendations are not being followed in the HPP planning process, since some dams had problems with environmental licenses, as mentioned in the studies. Therefore, we conclude that methodological adjustments, as well as political and institutional enhancements in these processes could make the tools more useful. (C) 2014 Elsevier Ltd. All rights reserved.
机译:在未来的二十年里,巴西将为北部地区的水电部门增加31.7吉瓦的装机容量,以跟上该国经济的增长步伐。由于该地区的社会环境脆弱性,国际上对该地区的保护表示关注。自2007年以来,水电潜力清单已采用综合环境评估(IEA),同时考虑了对流域所有水力发电厂的累积和协同影响的分析。还可以使用战略环境评估(SEA),这是美国国家水利局在其战略水资源计划中使用的工具,旨在支持流域政治,规划和计划级别的决策,可持续发展方案。两种工具最近都在巴西使用,本文旨在分析它们的差异以及它们对巴西电力行业决策过程的主要贡献。因此,我们分析了关于Tocantins-Araguaia流域新建水电厂的3项研究:Tocantins和Araguaia流域战略水资源计划-PERH-TA(使用SEA方法),Tocantins流域的LEA和Araguaia流域的IEA,分析了它们的方法,方案,结果和建议。我们发现,与LEA相比,SEA提供了对社会和环境影响的更广泛,更独立的视野。在完成综合战略研究后,我们验证了HPP规划过程中未遵循某些建议,因为研究中提到,某些水坝的环境许可证存在问题。因此,我们得出结论,在这些过程中进行方法上的调整以及政治和体制上的改进可以使这些工具更有用。 (C)2014 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号