...
首页> 外文期刊>Renewable & Sustainable Energy Reviews >Wind curtailment of China's wind power operation: Evolution, causes and solutions
【24h】

Wind curtailment of China's wind power operation: Evolution, causes and solutions

机译:限制中国风电运营的风电:演变,成因和解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Since 2010 China has faced a worrying phenomenon "wind curtailment" in the development and operation of the wind power industry. This phenomenon has resulted in sharp decline of the utilization hours of the wind power equipment, seriously affected the economic benefits of the wind farms and caused serious energy waste. The wind curtailment in China is seemingly caused by the volatility of the wind power technical characteristics. However, judging from a deep level, the planning, networking management and policies play a critical role. With analysis this paper makes such a conclusion: it is not practical to solve the wind curtailment of China solely with the technical solutions and comprehensive measures must be taken. The paper offers strategies from the planning, policy and technical levels to solve the wind curtailment problem according to the actual situation of China and by referring to experiences of developed countries. (C) 2015 Elsevier Ltd. All rights reserved.
机译:自2010年以来,中国在风电行业的发展和运行中面临着令人担忧的“风电削减”现象。这种现象导致风电设备的使用小时数急剧下降,严重影响了风电场的经济效益,造成了严重的能源浪费。中国的风电削减似乎是由风电技术特征的波动引起的。但是,从深层次来看,规划,网络管理和策略起着至关重要的作用。通过分析得出这样的结论:仅靠技术手段解决中国的风电削减是不现实的,必须采取综合措施。本文根据中国的实际情况,结合发达国家的经验,从规划,政策和技术层面提出了解决风电削减问题的策略。 (C)2015 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号