首页> 外文期刊>Renewable Power Generation, IET >Stochastic economic dispatch of power system with multiple wind farms and pumped-storage hydro stations using approximate dynamic programming
【24h】

Stochastic economic dispatch of power system with multiple wind farms and pumped-storage hydro stations using approximate dynamic programming

机译:多次风电场电力系统随机经济调度,使用近似动态规划用多个风电场和泵送储存水力站

获取原文
获取原文并翻译 | 示例
           

摘要

The stochastic economic dispatch problem of power system with multiple wind farms and pumped-storage hydro stations is formulated as a specific stochastic dynamic programming (DP) model, i.e. stochastic storage model, it is impossible to obtain an accurate solution due to the curse of dimensionality. Based on the approximate DP (ADP) method, the stochastic storage model can be transformed into a series of mixed-integer linear programming (MILP) models by describing the approximate value functions (AVFs) as convex piecewise linear functions in post-decision states. The AVFs are first initialised using the results of the deterministic model under a forecast scenario of wind farm output and then trained by scanning stochastic sampling scenarios consecutively with the successive projective approximation routine algorithm. To obtain a near-optimal day-ahead dispatch scheme, the forecast scenario is substituted into the MILP models expressed by the trained AVFs and is solved forward through each time interval. The network constraints are incorporated by the while-loop detection of critical lines. Test results on an actual provincial power system and the modified IEEE 39-bus system, including the comparison among the ADP, DP, scenario-based and chance-constrained programming methods, demonstrate the feasibility and efficiency of the proposed model and algorithm.
机译:具有多个风电场和泵送储存水力站的电力系统的随机经济调度问题作为特定随机动态编程(DP)模型,即随机存储模型,由于维度诅咒,不可能获得准确的解决方案。基于近似DP(ADP)方法,通过描述近似值函数(AVFS)作为后决策状态下的凸起分段线性函数,可以将随机存储模型转换为一系列混合整数线性编程(MILP)模型。首先使用在风电场输出的预测场景下的确定性模型的结果首先初始化AVF,然后通过连续扫描随机采样方案,与连续的投影近似例程算法扫描随机采样方案。为了获得近乎最佳的日落调度方案,预测场景被替换为受训练的AVF表示的MILP模型,并通过每个时间间隔进行解决。网络约束通过临界线的循环检测并入。测试结果对实际省级电力系统和改进的IEEE 39总线系统,包括ADP,DP,基于方案和机会约束编程方法的比较,证明了所提出的模型和算法的可行性和效率。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号