首页> 外文期刊>Renewable energy >Can 100% renewable power system be successfully built?
【24h】

Can 100% renewable power system be successfully built?

机译:可以成功建立100%可再生电力系统吗?

获取原文
获取原文并翻译 | 示例
       

摘要

Global warming has been a critical issue in recent years. Many leaders and politicians have talked about replacing fossil fuels with Renewable Energy Resources (RES). Some of them even went further and are talking about running a country with 100% RES soon. Is that economically viable? What would be the estimated cost of such a system? In this paper, a city in west Texas with a 100 MW peak load has been assumed to operate with the wind, solar, and Battery Energy Storage System (BESS) totally disconnected from the grid for a cost evaluation. Real generation and load time series data are used to achieve an optimum combination of the installed capacity of those resources by minimizing the total overnight cost, respecting a maximum of 24 h of faults in which the system cannot provide the load during the period. A Monte Carlo simulation is applied to the previous results to evaluate the influence of faulty devices and increase the robustness of the system. The results for both cases are analyzed and compared. Finally, the total cost of install capacity will be compared with other non-renewable resources. (c) 2021 Elsevier Ltd. All rights reserved.
机译:近年来,全球变暖一直是一个关键问题。许多领导人和政治家谈到用可再生能源(RES)替换化石燃料。其中一些甚至进一步走了,正在谈论以100%的res很快运行一个国家。在经济上可行吗?这种系统的估计成本是多少?在本文中,假设具有100 MW峰值负荷的西德克萨斯州的城市与风,太阳能和电池储能系统(BESS)与网格完全断开以进行成本评估。实际生成和负载时间序列数据用于通过最大限度地减少总夜间成本,最大为24小时的故障来实现这些资源的安装容量的最佳组合,其中系统在该系统期间无法提供负载。蒙特卡罗模拟应用于以前的结果,以评估故障器件的影响并增加系统的鲁棒性。对两种情况的结果进行了分析并进行比较。最后,将与其他不可再生资源进行比较,安装容量的总成本将与其他不可再生资源进行比较。 (c)2021 elestvier有限公司保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号