首页> 外文期刊>Renewable energy >A radial-grouping-based planning method for electrical collector systems in tidal current generation farms
【24h】

A radial-grouping-based planning method for electrical collector systems in tidal current generation farms

机译:潮汐电流发电机农场电集电极系统的基于径向分组的规划方法

获取原文
获取原文并翻译 | 示例
       

摘要

This paper proposes a radial-grouping-based planning method for the electrical collector systems (ECSs) to design the topology and select the cross-sections of ECS submarine cables in tidal current generation farms (TCGFs) while minimizing investment and operation costs. First, an angle-based radial-grouping method is proposed to group the tidal current turbines (TCTs) in a TCGF, considering their capacity limitations while avoiding the trans-region crossing of submarine cables. Second, an optimal planning model is presented to determine the connection scheme for the TCTs within the same group in a TCGF. The investment and trenching costs of submarine cables and ECS power losses are modeled to minimize the comprehensive annual equivalent cost of ECS, while satisfying the submarine cables' voltage drop and capacity limitation constraints. Third, an efficient solution method is developed by modifying a genetic algorithm with the Prufer number, which retains the ECS radial topology and connectivity with high computational efficiency. Finally, two TCGFs with distinct characteristics in the North Orkney Islands, Scotland, and their measured tidal current data are used to demonstrate the effectiveness, correctness and adaptability of the proposed method. (C) 2020 Elsevier Ltd. All rights reserved.
机译:本文提出了一种基于径向分组的电气集电极系统(ECS)的规划方法,用于设计拓扑,并在潮汐流行农场(TCGFS)中选择ECS潜艇电缆的横截面,同时最大限度地降低投资和运营成本。首先,提出基于角度的径向分组方法来在TCGF中对潮汐电流涡轮机(TCT)进行分组,考虑到它们的容量限制,同时避免潜艇电缆的跨区域交叉。其次,提出了最佳规划模型以确定TCGF中同一组中TCT的连接方案。模型潜艇电缆和ECS功率损耗的投资和挖掘成本是为了使ECS的综合年度等效成本进行建模,同时满足潜艇电缆的电压降和容量限制约束。第三,通过用Prufer号修改遗传算法来开发有效的解决方法,该算法保留ECS径向拓扑和具有高计算效率的连接。最后,在北奥克尼群岛,苏格兰群岛和测量的潮流数据中有两个具有不同特征的TCGF,用于证明所提出的方法的有效性,正确性和适应性。 (c)2020 elestvier有限公司保留所有权利。

著录项

  • 来源
    《Renewable energy》 |2021年第1期|632-641|共10页
  • 作者单位

    Chongqing Univ State Key Lab Power Transmiss Equipment & Syst Se Chongqing 400044 Peoples R China;

    Chongqing Univ State Key Lab Power Transmiss Equipment & Syst Se Chongqing 400044 Peoples R China;

    Nanyang Technol Univ Sch Elect & Elect Engn Singapore 639798 Singapore;

    Chongqing Univ State Key Lab Power Transmiss Equipment & Syst Se Chongqing 400044 Peoples R China;

    State Grid Hunan Elect Power Corp Res Inst Changsha 410007 Peoples R China;

    State Grid Chengdu Power Supply Co Chengdu 611830 Peoples R China;

  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

    Electrical collector system; Prufer number; Tidal current generation farm; Tidal current turbine;

    机译:电集电极系统;PRUFER编号;潮流发电场;潮汐电流涡轮机;

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号