Is Concentrated Solar Power (CSP) a feasible option for Sub-Saharan Africa?: Investigating the techno-economic feasibility of CSP in Tanzania

机译:集中式太阳能(CSP)在撒哈拉以南非洲地区是否可行?:调查CSP在坦桑尼亚的技术经济可行性

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

There is a noticeable shortage of solar energy related information in Sub-Saharan Africa, especially about Concentrated Solar Power (CSP) technology. The Tanzanian official generation expansion plan till 2040 showed high dependency on coal and gas fired power plants and a negligible role of renewables other than large hydropower. This study investigates the techno-economic feasibility of CSP technology in Tanzania, through modelling Parabolic Trough and Solar Tower CSP technologies using the System Advisor Model developed by the U.S. National Renewable Energy Laboratory. Under debt interest rate of 7%, the levelized cost of electricity (LCOE) for the modelled Solar Tower plants ranges from 11.6 to 12.5 (sic)/kWh while for the modelled Parabolic Trough plants ranges from 13.0 to 14.4 (sic)/kWh. The LCOE increases significantly from 14.4 it /kWh (at 7% debt interest rate, for government-led projects) to 25.9 (sic)/kWh (at 18% debt interest rate, for private investors-led projects). The study concludes that the feasibility of CSP in Tanzania is strongly dependent on the financing conditions. Policy mechanisms to de risk CSP projects' investment through accessing lower debt interest rate are required to ensure the competitiveness of CSP projects in the country. (C) 2018 Elsevier Ltd. All rights reserved.
机译:在撒哈拉以南非洲,与太阳能相关的信息明显短缺,尤其是有关集中式太阳能(CSP)技术的信息。坦桑尼亚到2040年的官方发电扩张计划显示出对燃煤和天然气发电厂的高度依赖,除大型水电以外,可再生能源的作用微不足道。本研究通过使用美国国家可再生能源实验室开发的System Advisor模型对抛物线槽和太阳能塔CSP技术进行建模,从而研究了CSP技术在坦桑尼亚的技术经济可行性。在7%的债务利率下,模型的太阳能塔发电厂的平均电费(LCOE)为11.6至12.5(sic)/ kWh,而模型的抛物槽发电厂的平均电费(LCOE)为13.0至14.4(sic)/ kWh。 LCOE显着提高,从14.4 it / kWh(对于政府主导的项目,债务利率为7%,增至25.9(原文如此)/ kWh(对于私人投资者主导的项目,债务利率为18%)/ kWh。研究得出的结论是,CSP在坦桑尼亚的可行性在很大程度上取决于融资条件。需要通过降低债务利率来降低CSP项目投资风险的政策机制,以确保CSP项目在该国的竞争力。 (C)2018 Elsevier Ltd.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号